New Facilities

This capital project will include the following features strongly supported by our community survey:

Warm Water Aquatics Center
A new Warm Water Aquatics Center will provide enhanced options for physical therapy, as well as a zero-depth access that will make the pool easier and safer for seniors, children and people with disabilities to use. It will allow the water temperature in the existing pool to be lowered to more comfortably accommodate lap swimming, swim team and other athletic activities.


Health & Fitness Center
A brand new Health & Fitness Center will be built on the ground floor to allow more people to use fitness and therapy equipment and free up existing space for other activities.

Elevator
For the first time, an elevator will be installed to provide access for everyone to all levels of the building.

  Heating, Ventilation and Air
Conditioning Our systems will be upgraded to serve the entire Y building.

More information:

AQUATIC CENTER
• Warm water, L-shaped therapy pool
• Treatment room
• Four-lane lap pool
• Zero depth, easy entry
• Slide for children’s area
• 6,000 square feet

Benefits: The facility will provide an additional warm water pool for therapy, exercise, instruction and youth and family swimming, with accessibility for all.


FITNESS CENTER
• Expanded fitness area
• Ground-floor accessibility
• Improved ventilation
• 5,000 square feet

Benefits: Will create a new and larger space for exercise and free up space for fitness programs currently overflowing into the gym and playing courts.


ELEVATOR
• Access to all three levels of the YMCA building
• 2,000 square feet

Benefits: Provides ease of accessibility for
everyone to the track, the meeting room and
other facilities.

HVAC
• To serve the entire building and
upgrade air quality in the existing
pool area.

OTHER INVESTMENTS
• Addition to the endowment fund
• Professional and contingency fees